B2B sourcing control · exit gate

Supplier Exit Transition Plan

Use this plan when monitoring, corrective action, claim settlement, price negotiation or backup activation is no longer enough. The objective is to leave a risky supplier in a controlled sequence: protect current goods, documents, deposits, tooling, claims and replacement capacity before announcing a hard exit.

Exit triggers

  • Evidence failure: supplier cannot provide consistent identity, production, inspection, shipment or payment-account evidence.
  • Repeated quality failure: corrective actions are late, unverified or contradicted by the next inspection/arrival result.
  • Commercial pressure: price, MOQ, lead time or payment terms change after commitment without documented cost basis.
  • Recovery failure: refund, credit, replacement, rework or repair promises pass their due dates without proof.
  • Continuity risk: the supplier becomes a single point of failure and a verified backup can cover the next order.

Exit risk register

Open orderList quantities, deposits, unpaid balances, production stage, inspection status and ship date.
AssetsConfirm tooling, molds, labels, artwork, samples, test files and packaging ownership or retrieval path.
DocumentsSecure invoice, packing list, certificate, test report, export document and prior approval records.
ClaimsFreeze unresolved credit, refund, replacement or damage claims with value, due date and evidence.

Controlled transition sequence

  1. Score the supplier with the supplier performance scorecard and confirm the exit reason is evidence-based.
  2. Check any active recovery item in the recovery follow-up calendar and claim value in the claim settlement tracker.
  3. Activate or validate replacement capacity with the backup supplier activation checklist.
  4. Freeze a clean specification package for the replacement supplier: drawings, sample photos, packaging, inspection standard, test reports and target quantity.
  5. Decide the exit path: finish current order under controls, split remaining volume, transfer the next PO, or stop immediately and restart sourcing.

Exit decision table

Supplier weak but open order recoverableControlled finish — complete only with inspection, document and balance-payment gates.
Supplier risk rising + backup readySplit transition — move new volume to backup while closing existing commitments.
Supplier fails evidence or claim obligationsExit — stop new orders, preserve claim evidence and move the next PO elsewhere.
No verified replacementPause expansion — do not scale until a new supplier passes evaluation and sample checks.

Copy-ready exit notice

We are freezing new purchase orders while we close the current open items and review replacement capacity. Please confirm the status of all open quantities, documents, tooling/assets, claim items and payment balances by the stated deadline. New order discussion will remain on hold until the evidence package is complete.